CASE 3
USED PAPERMACHINE AND BOILERS TO ALEXANDRIA, EGYPT
Belgoirin was asked to organized the shipment from door Düren Germany to Alexandria, Egypt of a used papermachine and 2 boilers of 11000 x 44750 x 4600 mm and weighing 42000 kg and 61000 kg.
Because the units could not travel by road to Antwerp, the units were transported to the port of Cuijk for transloading into barge to complete the voyage to Antwerp to meet the conventional service calling at Alexandria. Belgoirin organized the lifting of the boilers both at the loadingpoint and the transhipment port.
CASE 4
PULPER FROM GERMANY TO EGYPT
Belgoirin organized the shipping of a pulper 27 mtr long Pulper weighing 71 tons from To clear the concrete foundation Belgoirin assisted with the Hydraulic Jacking up and support of the unit, after the foundation was removed the unit was rolled out and transported to Antwerp for shipping to Egypt.
CASE 7
PAPERMILL CORBEHEM TO DALIAN
Belgoirin coordinated the shipment of the Stora Enso Papermill from
Corbehem, France to Dalian, China. Our specialists on site closely cooperated with the Chinese buyers to organize a smooth loading. 407 x 40’ shipper’s owned containers were delivered on site and after loading transported to Antwerp for shipping. 4400 Cbm not containerisable cargo was shipped conventional.